Description

  • Replacement of a simple box design chute at end of life with an engineered transfer system designed to control material
  • 95ft drop
  • 23ft horizontal displacement
  • 6 floor levels

Scope

  • Design, supply and installation of an engineered Advanced Transfer System that includes the patented J-Glide Adjustable Loading Technology
  • Curved design rather than straight drop
  • Velocity of material slowed down and controlled
  • Addition of inspection doors to improve access

Results

  • The coal is center loading on the belt, matching belt speed and direction, extending belt life
  • The material flow is controlled, gently loading on the belt, eliminating dust generation and now extending wear life of liners
  • No pluggage or spillage has been experienced
  • All work was completed on time and under budget